learn about our history

About Us

One Step Ahead

Background

National Highway Authority (NHA) with the assistance of the Infrastructure Project Development Facility (IPDF), Ministry of Finance intended to develop a Railway Overhead Bridge at Habibabad under the Public Private Partnership (PPP). The existing bridge constructed in 1986 needed major rehabilitation and geometric improvement to attain the design speed (110Km/Hour) as currently implemented on National Highway. Construction of new flyover was entrusted to FWO on BOT basis during April 2014 for a concession period of 10 years with the following benefits:-

Socio Economic Benefits

  1. Improved safety standards for the commuters due to a better design.
  2. Reduction of the social and vehicle operating costs.
  3. Safe and smooth traffic flow reducing accident hazards with reasonably high speed.
  4. Electronic Traffic & Toll Management System at Pattoki Toll Plaza.

Home Pvt Ltd.

Mission Statement

As a FWO owned subsidiary, carried out all such activities to ensure timely and cost effective fulfillment of the company’s all professional and contractual obligations as Concessionaire.